With weather delays, holidays and other things afoot, the siding has been a little here and a little there. That's okay, though. When things were slow outside, they were hustling inside.
Sheetrock was ordered...
rough-ins were installed, work began on plumbing and wiring...
John installed a half mile of network, video and speaker cable...
a few fixtures were installed
and duct work was run for the HVAC.
Much discussion over what size HVAC unit to install. In the end we opted for a 5-ton single unit. Those windows are gorgeous, and under the shade of the porches, and slightly tinted, but there are still 36 of them, and that's a lot to keep up with!